A pilot at one gate covering identity, competency, safety sign-off, live muster and timesheets.
Prepared for
Your Organisation
Prepared by
MOVO-X Inc., Masai, Johor
Reference · Date
MOVO-X/OG/PROP/2026-001
22 November 2026
Commercial in confidence
◆01Executive summary
Replace the gate logbook with a kiosk, starting at one gate.
MOVO-X proposes a pilot of its self-service workforce kiosk at one gate of your facility. Every worker who arrives is identified and checked against their certificates. They sign off the pre-shift safety checklist and are added to a live headcount, and their hours flow into the timesheet.
We would run the pilot alongside your current sign-in, so it can be measured against it without risk to operations. If it meets the success criteria in section 05, we roll it out gate by gate.
We are a Johor-based team. Our oil & gas workflow is available to demonstrate. This would be our first oil & gas production pilot; section 08 sets out what is ready to demonstrate and what needs validation at your site.
◆02Objectives
What the pilot is designed to answer.
Faster shift change
Does kiosk check-in cut the queue at the gate compared with the logbook?
No uncertified entry
Are expired or missing certificates stopped at the gate rather than found at audit?
A muster list you can trust
Can HSE produce an accurate on-site list within a minute of the alarm?
Clean timesheets
Do kiosk timestamps reproduce the hours supervisors currently rebuild by hand?
◆03Proposed solution
How a check-in works.
01Idle screen.Shift window, site safety record, weather and a live roster ticker.02Choose how to verify.Badge tap, fingerprint or face — configured per site.03Identity check.The worker is matched in about two seconds.04Competency check.Role, team and every certificate with its expiry date. Expired means no entry.05Shift action.Clock in, clock out, break or report an incident.06Confirmed.Timestamped, on the headcount board and in the timesheet instantly.
Your certificate types, checklist wording, shift patterns and overtime rules. English and Bahasa Malaysia
Data load
Import of the worker and contractor list and certificate expiry dates from your spreadsheet or HR export
Training
Gate staff, supervisors and HSE. Short worker briefing material
Support
On-site support during go-live week, then remote monitoring and support for the rest of the pilot
Reporting
Weekly pilot report against the success criteria, and a close-out report
Optional in the pilot
· Payroll calculation (EPF, SOCSO, EIS, PCB) and bank file export
· Fingerprint or face verification
· WhatsApp alerts to supervisors and HSE
· Integration with your access control, HR or ERP
Not included
· Installation in Ex / ATEX hazardous zones
· Turnstiles, barriers or civil works
· Network cabling and power to the kiosk position
· Replacement of your existing payroll system
◆04AWorkforce & payroll
From the gate timestamp to an approved payroll export.
One proposed workflow connects contractor attendance, supervisor review and payroll preparation. The pilot starts with timesheet export; payroll calculations and integrations are optional scope, validated with your team before use.
Worker and contractor register
Import direct staff and contractor crews, assign employer, role, shift and required certificates. Review expiry dates before the shift.
Attendance and exceptions
Record clock-in/out and breaks. Review missed punches, late arrivals and disputed hours; keep the original timestamp alongside approved corrections.
Supervisor approval
Agree overtime, shift allowances and approval roles at survey. Supervisors reconcile exceptions before hours are released to payroll.
Payroll preparation
Optional gross-to-net calculation, deductions and bank/export formats are scoped to your payroll process. Your payroll owner validates current rules and a parallel run before approval.
Operations and HSE
Filter on-site headcount by gate, employer and crew. Use certificate refusal logs, checklist acknowledgements and a timed muster drill to evaluate the pilot.
Integration and rollout
CSV export is the starting point. HR/ERP APIs, access barriers, bank formats and multi-site reporting require a separately agreed interface and acceptance test.
The demos use fictional workers and sample payroll data. Third-party logos or export targets do not establish an active integration. Explore the supervisor demo →
◆05Success criteria
Measured against your baseline, not our brochure.
We measure your current figures during the site survey and agree the targets with you in writing before go-live.
Measure
How we measure it
Target
Average check-in time per worker
Kiosk timestamps vs. stopwatch baseline
Agreed at survey
Peak queue at shift change
Observed at baseline vs. pilot weeks
Agreed at survey
Uncertified entries
Refusals logged vs. audit findings
Zero
Time to produce a muster list
Timed drill with HSE
Agreed at survey
Timesheet variance
Kiosk hours vs. approved hours
Agreed at survey
Kiosk availability
Fleet monitoring
Agreed at survey
◆06Timeline
Survey to go-live in two to four weeks.
Week 0
Site survey
Gate walk with HSE and admin. Baseline measurements, network check, kiosk model and position agreed.
Weeks 1–2
Configure and install
Worker data loaded. Certificate rules, checklist and shift rules set up. Kiosk delivered and commissioned.
Weeks 2–3
Parallel run
The kiosk runs beside the logbook. We reconcile headcount and hours daily and train supervisors.
Week 4 →
Pilot live
The kiosk becomes the record at the pilot gate. Weekly reports run until close-out and the decision to roll out.
Hardware lead time depends on the model and stock. We confirm it in the quotation.
◆07Commercials
Priced to your site, quoted after the survey.
Pricing depends on the number of gates and workers, the hardware model, and the optional modules. We issue a formal quotation in MYR after the site survey.
One gate
Pilot
Custom
·Kiosk hardware for the pilot gate
·Check-in, certificate gating, safety sign-off
·Live headcount / muster board
·Timesheet export
·Go-live week on site
·Weekly pilot reports
All gates at one facility
Site
Custom
·Everything in Pilot
·Additional kiosks per gate
·Contractor company reporting
·Payroll module (optional)
·WhatsApp alerts
·Annual support and updates
Several facilities or yards
Multi-site
Custom
·Everything in Site
·Group-level dashboard
·Integration with HR / ERP / access control
·Named account manager
·Service-level agreement
·Spare-unit pool
◆08Pilot readiness
What is ready to demonstrate, and what the pilot would prove.
We do not yet have an oil & gas site in production. The interactive kiosk and payroll demos use simulated data. This pilot would validate the workflow with your workers, certificates, gate conditions and payroll process against the agreed success criteria before any wider rollout.
Hours, overtime and statutory deductions; export to your payroll or bank file.
Built · demo-ready
Integration with your HR / ERP / access control
Scoped during the site survey — CSV, API or database export.
Configured per site
A demonstration of the kiosk workflow and hardware can be arranged with the MOVO-X team. Site-specific readers, access-control links and payroll exports are confirmed during the site survey.
This document consolidates the gate, workforce and payroll scope for prospect review. Pricing remains Custom, subject to site survey and a written quotation. A reference is evidence of the kiosk platform in healthcare, not an oil & gas deployment or certification.
◆09Responsibilities & assumptions
Who does what.
MOVO-X
· Hardware supply, installation and commissioning
· Software configuration, data import and testing
· Training, go-live support and pilot reporting
· Remote monitoring and fixes during the pilot
Your Organisation
· A named pilot owner (HSE or site admin)
· Worker, contractor and certificate list in a spreadsheet
· Power and network at the kiosk position
· Site access, inductions and permits for our team
Personal data is processed under the Personal Data Protection Act 2010 for workforce purposes only. Data ownership remains with Your Organisation.
◆10Next steps
Three steps to a pilot.
01
Demo call
30 minutes walking through the live kiosk and dashboards with your HSE and operations leads.
02
Site survey
A half-day at the proposed pilot gate, which gives us the baseline measurements.
03
Quotation & go
A formal MYR quotation and agreed success criteria, then installation.